Detached ADUs · Utah
A detached accessory dwelling unit is a complete second home in your backyard — your parents' place, your kid's first apartment, or a permitted long-term rental. Arena builds them from cold-formed steel and quotes them from the component build-up. Licensed general contractors handle permits and engineering.
Takes about 3 minutes. No email required to see your result.
Utah S.B. 284 makes a detached ADU a permitted use on most lots of 11,000 sq ft or more. No conditional use permit, no hearing. How the law works →
The component build-up — design, engineering, permits, the foundation, the Arena Standard and finishes. Land, the front door, and parcel-specific site work are quoted separately. How the price works →
Licensed Utah GCs on Arena's own team, foundation to finish. Panels CAD-cut in a Salt Lake-area factory, craned in and assembled on site — not a year of strangers in your side yard.
Real bedrooms, real baths, a rooftop deck with solar. It rents like a two-bedroom apartment, not a tiny home. Run the rent math →
The Lookout, the Encore, and the Loft. Each one is a component stack, and the price on the card is that build-up.



What's in the number
A home is a footprint, a living level, any sleeping levels, a loft, a rooftop deck and a garage. Stairs come with a sleeping level, loft or deck. Build your own prices that mix from the same engine every proposal uses.
Three ways families use one
Close enough to check on, far enough that everyone keeps their own front door. Single-story plans, no stairs, and a fraction of what assisted living costs each month.
A real place to live while they save a deposit — on the property you already own, instead of a Sugar House one-bedroom that costs more than they clear in a week.
A long-term tenant in a legal, permitted unit. Most owners finance against equity they already have and let the rent carry the payment. How financing works →
Where we build
Questions
An accessory dwelling unit is a second, self-contained home on the same lot as a single-family house — its own kitchen, bath, bedroom and entrance. Arena builds detached ADUs: a complete steel-framed backyard home. The Lookout is 672 square feet. The largest plan in the guide is 2,949.
Licensed Utah general contractors on Arena's own dedicated crew — the same team from foundation to finish, not a rotating cast of subcontractors. Arena's crews have completed internal basement ADUs across the Wasatch Front and have detached units in permitting now; the first Arena model home breaks ground in Draper in September 2026.
Financing runs 3–5 weeks, permitting 3–5 weeks, construction 6–8 weeks, and staging and finish 2 weeks. Steel panels are CAD-cut in a Salt Lake-area factory while the site is prepared, then assembled on site.
Yes. Utah's new law lets cities require a 90-day minimum tenancy, so an ADU is a long-term rental, not a nightly listing. Arena plans rent for roughly $1,400–$2,850 a month across the Wasatch Front depending on the plan.
From October 1, 2026, a detached ADU is a permitted use on most lots of 11,000 sq ft or more in Utah cities of 5,000 people or more. Smaller lots often qualify under existing city rules. Enter your address and Arena checks the parcel for you.