Salt Lake County · Service area

Can you build a backyard home in Draper?

Draper's rules are proportional — and that's the part worth reading.

Already allowed The statute removes the discretion.

Takes about 3 minutes. No email required to see your result.

What changes here on October 1

Draper's rules are proportional — and that's the part worth reading.

Draper already permits detached ADUs, but sizes them against your existing house rather than a flat cap. From October 1 the city can no longer route a qualifying detached unit through a conditional use permit.

“A specified municipality shall adopt a land use regulation that permits a detached accessory dwelling unit on any lot or parcel that is 11,000 square feet or larger…” — S.B. 284, Enrolled Copy, Utah Code § 10-21-304, effective October 1, 2026.

The numbers that decide your project

Draper ADU rules at a glance

RuleDraper — Draper City Code 9-10
Maximum sizeDetached ADU limited to 50% of the primary dwelling's square footage. confirm with city
SetbacksSame building setbacks as a house in the underlying zone. confirm with city
HeightUp to 35 ft. confirm with city
ParkingAt least one extra space on site, not tandem and not directly behind another space. confirm with city
Owner occupancyThe primary dwelling must be owner-occupied. confirm with city
One or the otherNo internal ADU is allowed if a detached ADU exists. One per property. confirm with city
UtilitiesMay not be served by separate utility meters from the primary dwelling. confirm with city

state law Quoted from the enrolled copy of S.B. 284 — primary source, verified.
confirm with city From the city's published ADU material or council reporting — Arena confirms at the planning counter before design.
moving now The city is actively amending this ahead of October 1, 2026. Treat as a moving target.
We would rather show you the gap than guess. Arena is a builder, not a law firm — confirm your parcel with Draper before you sign anything.

What that means on your lot

Because Draper sizes the ADU at 50% of your house, a larger home is worth more here than a larger lot — a 2,400 sq ft house supports a 1,200 sq ft ADU.

Is my Draper lot 11,000 sq ft?

That single number decides whether the new state law applies to you. Enter your address above — we'll tell you which rule you fall under and which plans fit, in about three minutes.

Fixed price, Draper-wide

Arena publishes every price — seven plans from The Lookout at 735 sq ft to The Launchpad at 2,541 sq ft. One team owns design, engineering, permitting and construction.

From $128,625 · see every price →

Plans that fit a Draper backyard

Three places to start

See all seven plans

There's still $2,200 a month hiding in your house.

Permitting queues in Draper will not get shorter after October 1.