Salt Lake County · Service area
Sandy runs ADUs through a Special Use Approval — and that's exactly what the statute targets.
Already allowed The statute removes the discretion.
Takes about 3 minutes. No email required to see your result.
Sandy has permitted accessory apartments for years, but through a discretionary approval tied to a business licence. S.B. 284 bars a conditional use permit for a qualifying detached unit in a residential zone, so Sandy's process is one of the ones most likely to change before October 1.
“A specified municipality shall adopt a land use regulation that permits a detached accessory dwelling unit on any lot or parcel that is 11,000 square feet or larger…” — S.B. 284, Enrolled Copy, Utah Code § 10-21-304, effective October 1, 2026.
The numbers that decide your project
| Rule | Sandy — Sandy City Land Development Code |
|---|---|
| Approval | Special Use Approval plus a business licence from Community Development, valid only while the owner keeps permanent residency at the property. confirm with city |
| Owner occupancy | Required, and approval lapses if the owner stops residing there. confirm with city |
| Entrances | New exterior entrances must be on the side or rear — not facing the street, and not visible from the front property line. confirm with city |
| Life safety | Carbon monoxide detector on each floor; smoke alarm in each sleeping area and at least one per floor. confirm with city |
| Size & setbacks | Not published in Sandy's public ADU material. Arena confirms these at the counter before design. moving now |
state law Quoted from the enrolled copy of S.B. 284 — primary source, verified.
confirm with city From the city's published ADU material or council reporting — Arena confirms at the planning counter before design.
moving now The city is actively amending this ahead of October 1, 2026. Treat as a moving target.
We would rather show you the gap than guess. Arena is a builder, not a law firm — confirm your parcel with Sandy before you sign anything.
What that means on your lot
That single number decides whether the new state law applies to you. Enter your address above — we'll tell you which rule you fall under and which plans fit, in about three minutes.
Arena publishes every price — seven plans from The Lookout at 735 sq ft to The Launchpad at 2,541 sq ft. One team owns design, engineering, permitting and construction.
From $128,625 · see every price →
Plans that fit a Sandy backyard



Permitting queues in Sandy will not get shorter after October 1.