ADU cost

How much does an ADU cost in Utah?

Most builders won't quote you until you're committed. Arena publishes every price: fixed and turn-key — design, permits, site work and the full Arena Standard included. Here is the whole menu.

PlanSq ftFixed priceEst. rent / mo
AH-01 · The Lookout
2 bed · 2 bath · 1-story + roof deck
735$128,625$1,400
AH-02 · The Loft
3 bed · 3 bath · main + loft level
955$167,125$1,650
AH-03 · The Uptown
3 bed · 2.5 bath · 2-story + rooftop
1,200$210,000$1,850
AH-04 · The Venue
3 bed · 2 bath · over a 3-car bay
840$147,000$1,700
AH-05 · The American Dream
5 bed · 4 bath · 2-story + rooftop
1,470$257,250$2,200
AH-06 · The Trifecta
6 bed · 4.5 bath · three units
2,268$396,900$2,850
AH-07 · The Launchpad
5 bed · 4 bath · 3-story · main home + 2/2 ADU
2,541$444,675$1,700

Every price is built from the footprint and the levels you choose, then published. Rent estimates are Wasatch Front averages from Arena's plan set; The Launchpad's figure is for its 2 bed / 2 bath ADU only. Land, and anything your city adds at the counter, is quoted separately.

What's in the number

Design, engineering, permits, foundation and site work, the steel frame, every system in the Arena Standard, and finishes. One contract, one team.

What isn't

The land under it, and anything specific to your parcel — a long utility run, a retaining wall, a city impact fee. Your advisor prices those against your address.

Why it's fixed

Panels are CAD-cut in a Salt Lake-area factory to a locked spec. The price you see before we break ground is the number you sign.

See your number in three minutes.

Enter your address. We'll tell you whether the October 1 law applies and what fits.

Good to know

What drives ADU cost

How much does an ADU cost in Utah?

Most ADUs in Utah cost between $150,000 and $350,000 to build in 2026. A garage or basement conversion typically runs $120,000–$200,000, while a detached new-build ADU of 600–1,000 sq ft generally runs $200,000–$350,000 depending on finishes, site work, and utility connections. Arena prices every plan at a fixed, published price, so The Lookout at 735 sq ft is $128,625 before you have given anyone your email.

Are ADUs legal in Utah?

Yes. Utah already required most cities to permit internal ADUs. From October 1, 2026, S.B. 284 (Utah Code § 10-21-304) also makes a detached ADU a permitted use on most lots of 11,000 sq ft or larger — no conditional use permit. Cities keep setbacks, height, parking caps and owner-occupancy rules, which is why we wrote a page for each city.

How long does it take to build an ADU?

From signed design to final inspection a typical Utah ADU takes 5–9 months with a conventional builder: 4–8 weeks of design and permitting, then 4–6 months of construction. Arena's cold-formed steel panels are CAD-cut in a Salt Lake-area factory and assembled on site, so the build itself moves in weeks.

Will an ADU add value to my home?

Generally yes. A well-built ADU adds both rentable income and resale value — many Utah homeowners see $1,200–$2,000 a month in rent and a meaningful bump in appraised value. Arena's plans are engineered to rent from day one, at roughly $1,400–$2,850 a month depending on the plan.

Can I finance an ADU?

Yes — common options include a home equity line of credit (HELOC), cash-out refinance, renovation loans, and construction loans. Some homeowners use projected rental income to help qualify. Arena can point you to Utah lenders who specialize in ADU financing.

Does my lot qualify for an ADU?

Most single-family lots in Utah qualify for at least an internal or attached ADU. For a detached unit, the number that matters from October 1 is 11,000 sq ft — above it, your city must permit one by right. Share your address and Arena will tell you what your specific lot allows.