Davis County · Service area
Layton's detached minimum is 6,000 sq ft — already well under the state line.
Already allowed The statute removes the discretion.
Takes about 3 minutes. No email required to see your result.
Layton is more permissive than the statute requires on lot size, allowing detached ADUs from 6,000 sq ft and asking for only one additional parking space. Single and two-storey detached units are both contemplated, with different limits.
“A specified municipality shall adopt a land use regulation that permits a detached accessory dwelling unit on any lot or parcel that is 11,000 square feet or larger…” — S.B. 284, Enrolled Copy, Utah Code § 10-21-304, effective October 1, 2026.
The numbers that decide your project
| Rule | Layton — Layton City Municipal Code |
|---|---|
| Detached minimum lot | 6,000 sq ft — well below the state's 11,000 sq ft threshold. confirm with city |
| Storeys | Single and two-storey detached ADUs both allowed, with different limitations by type. confirm with city |
| Parking | 1 additional space. confirm with city |
| Owner occupancy | Required. confirm with city |
state law Quoted from the enrolled copy of S.B. 284 — primary source, verified.
confirm with city From the city's published ADU material or council reporting — Arena confirms at the planning counter before design.
moving now The city is still bringing this into line with the law that took effect October 1, 2026. Treat as a moving target.
We would rather show you the gap than guess. Arena is a builder, not a law firm — confirm your parcel with Layton before you sign anything.
What that means on your lot
That single number decides whether the new state law applies to you. Enter your address above — we'll tell you which rule you fall under and which plans fit, in about three minutes.
Eight plans, from The Lookout at 784 sq ft to The Launchpad at 3,061 sq ft. A plan that is one component stack shows that price. The others say request a quote.
Plans that fit a Layton backyard

Since October 1, more Layton lots qualify. Get in the permitting queue early.